Availability of skims in PuT assignment procedures
The Table 170 shows which skims can be calculated per PuT assignment procedure.
|
Skim output by procedure |
Default ext. |
TSys-based |
HWay-based |
Timetable-based |
|
Journey time |
JRT |
X |
X |
X |
|
Journey time adapted |
JRTA |
|
|
X |
|
Ride time |
RIT |
X |
X |
X |
|
Ride time adapted |
RITA |
|
|
X |
|
In-vehicle time |
IVT |
X |
X |
X |
|
PuT Aux time |
AXT |
X |
X |
X |
|
Origin wait time |
OWT |
|
X |
|
|
Origin wait time adapted |
OWTA |
|
|
X |
|
Weighted origin wait time |
WOWT |
|
X |
|
|
Transfer wait time |
TWT |
|
X |
X |
|
Transfer wait time adapted |
TWTA |
|
|
X |
|
Weighted transfer wait time |
WTWT |
|
X |
|
|
Extended transfer wait time |
XTWT |
|
|
X |
|
Walk time |
WKT |
X |
X |
X |
|
Access time |
ACT |
X |
X |
X |
|
Egress time |
EGT |
X |
X |
X |
|
Perceived journey time |
PJT |
|
X |
X |
|
Number of transfers |
NTR |
X |
X |
X |
|
Service frequency |
SFQ |
|
X |
X |
|
Number of arrival time points |
NATP |
X |
||
|
Sharing travel time |
SHTT |
|
|
X |
|
Sharing time for rental process |
SHAT |
|
|
X |
|
Sharing travel distance |
SHTD |
|
|
X |
|
Sharing time for return process |
SHET |
|
|
X |
|
DRT distance |
DRTD |
|
|
X |
|
DRT time |
DRTT |
|
|
X |
|
DRT wait time |
DRTWT |
|
|
X |
|
Share of OD trips with relevant delay |
STRD |
|
|
X |
|
Risk of delay per person |
RDP |
|
|
X |
|
Direct distance |
DID |
X |
X |
X |
|
Journey distance |
JRD |
X |
X |
X |
|
Ride distance |
RID |
X |
X |
X |
|
Trip distance |
IVD |
X |
X |
X |
|
PuT additional width |
AXD |
X |
X |
X |
|
Walk distance (transfer walk links) |
WKD |
X |
X |
X |
|
Access distance |
ACD |
X |
X |
X |
|
Egress distance |
EGD |
X |
X |
X |
|
Journey speed |
JRS |
X |
X |
X |
|
Direct distance speed |
DIS |
X |
X |
X |
|
Fare |
FAR |
|
X |
X |
|
Number of fare zones |
NFZ |
|
X |
X |
|
Number of operator changes |
NOC |
|
|
X |
|
In-vehicle distance per TSys |
IVTD |
X |
X |
X |
|
In-vehicle distance percentage per TSys |
IVTP |
X |
X |
X |
|
In-vehicle time per TSys |
IVTT |
X |
X |
X |
|
Impedance |
IPD |
|
X |
X |
|
Impedance LogSum |
ILS |
|
|
X |
|
Utility |
UTL |
|
|
X |
|
Path leg attribute |
PLA |
|
X |
X |
|
Adaptation time |
ADT |
|
|
X |
|
Extended adaptation time |
XADT |
|
|
X |
|
Extended impedance (XIMP) |
XIMP |
|
|
X |
|
Equivalent journey time (user-defined) |
EJT |
X |
X |
X |
|
Discomfort due to capacity overload (only calculated during assignment) |
DISC |
|
|
X |
|
Share of fail to board |
SFB |
|
|
X |
|
Risk of fail to board per person |
RFGP |
|
|
X |
Table 170: Availability of skims in PuT assignment procedures

